Rancang Bangun Prototipe Sistem Monitoring Sinkronisasi Generator ke Jaringan PLN pada PLTM Berbasis SCADA
Main Article Content
Abstract
The power generator system generally consists of equipment to generate electricity, control systems, and monitoring systems. The monitoring system is usually located in a control room, which is located quite far from the generating equipment, so many use SCADA (Supervisory Control and Data Acquisition) as a solution for this. Design of a prototype monitoring system for synchronization of generators to the PLN line was carried out on a SCADA-based MHPP (Mini-Hydro Power Plant). The SCADA system presents data in the form of graphs and writings whose values are in the form of data from GPC-3 Hydro and PLC. The protocol used for communication is Modbus TCP/IP. The results of the tests that have been carried out prove that the created SCADA system is capable of monitoring RTU data from both GPC-3 Hydro and PLC in real-time while the generator is operating. The indicator is the suitability of data values between SCADA and Modbus which is connected to GPC-3 Hydro and PLC and is supported by the suitability of the time values recorded in the alarm table data and graphs.
Downloads
Article Details
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Artikel yang diajukan untuk dipublikasikan pada JTRM (Jurnal Teknologi dan Rekayasa Manufaktur) ini adalah karya dari penulis dan/atau tim penulis yang memiliki pembahasan pada bidang sains dan teknologi. Naskah tersebut belum pernah dipublikasikan di Jurnal (media) apapun atau tidak sedang diajukan untuk dipublikasikan pada jurnal atau prosiding lain. Apabila terdapat duplikasi penerbitan, artikel akan dicabut/dihapus oleh Dewan Redaksi.
Nama dan alamat email yang dimasukkan pada laman JTRM (Jurnal Teknologi dan Rekayasa Manufaktur) hanya akan digunakan sebatas kepentingan penerbitan artikel pada laman JTRM (https://jtrm.polman-bandung.ac.id/) dan tidak akan diberikan kepada pihak lain untuk kepentingan apapun.
References
[2] I. Nawawi and A. Trihasto, “Pemanfaatan Aliran Sungai Sebagai Pembangkit Listrik TenagaMikro Hidro Portabel,” Jurnal.Untidar.Ac.Id, pp. 1–4, 2019, [Online]. Available: https://jurnal.untidar.ac.id/index.php/lppmpmp/article/view/1890
[3] R. A. Subekti, “Studi Kelayakan Pengembangan Pembangkit Listrik Tenaga Minihidro Di Desa Sukamaju Kabupaten Garut Jawa Barat,” J. Tek. Hidraul., pp. 105–116, 2015, [Online]. Available: https://jurnalth.pusair-pu.go.id/index.php/JTH/article/view/515
[4] R. T. Jurnal, “Pengendalian Jaringan Distribusi 20 Kv Dengan Menggunakan Sistem Scada,” Energi & Kelistrikan, vol. 9, no. 1, pp. 41–50, 2018, doi: 10.33322/energi.v9i1.56.
[5] Rimbawati, P. Harahap, and K. Putra, “Analisis Pengaruh Perubahan Arus Eksitasi Terhadap Karakteristik Generator,” J. Tek. Elektro, vol. 2, no. 1, pp. 37–44, 2019.
[6] S. Ardhi, “Pengendalian Sinkronisasi Generator Dengan Sumber Pembangkit Listrik Secara Otomatis Berbasis Mikrokontroller,” Din. Teknol., vol. 7, no. 1, pp. 36–42, 2015.
[7] A. B. Setiawan, “Peningkatan Keamanan Supervisory Control and Data Acquisition (Scada) Pada Smart Grid Sebagai Infrastruktur Kritis Improved Security Supervisory Control and Data Acquisition (Scada) the Smart Grid As Critical Infrastructure,” Peningkatan Keamanan Superv. Control Data Acquis. Pada Smart Grid…, vol. 6, no. 1, 2016, doi: 10.17933/jppi.
[8] Yusniati and Matondang NNS, “Analisis sistem pembebanan pada generator di PT.PLN (persero) pembangkit listrik tenaga diesel titi kuning,” Semnastek Uisu , pp. 59–64, 2020.
[9] T. Satu, F. Menggunakan, T. Parameter, and A. Bolak, “1) 2) 3),” pp. 1–12.
[10] R. Ridwan, M. H. Swistiawan, and S. Bagas Bhaskoro, “Otomatisasi Sistem Bendung menggunakan Metode Backpropagation untuk Mengatur Debit Air berbasis Internet of Thing,” J. Teknol. dan Rekayasa Manufaktur, vol. 3, no. 2, pp. 73–86, 2021, doi: 10.48182/jtrm.v3i2.67.
[11] S. D. Wirayanto, A. Arlenny, and E. Zondra, “Sistem SCADA Pada Jaringan Distribusi PT.PLN (Persero) UP2D Pekanbaru,” J. Tek., vol. 16, no. 2, pp. 123–129, 2022, doi: 10.31849/teknik.v16i2.11094.
[12] D. & M. K. Antono, “Penerapan sinkronisasi jaringan tiga fasa PLN dengan generator sinkron mneggunkan trainner power sistem simulation,” Penerapan Sink. Jar. tiga fasa PLN dengan Gener. Sink. mneggunkan trainner power Sist. Simul., vol. 2, no. 3, pp. 151–158, 2013, [Online]. Available: Sinkronisasi generator, tegangan, frekuensi, arus
[13] M. Ananto, … K. W.-… R. W. and, and undefined 2021, “Rancang Bangun Sistem SCADA Panel Automatic Transfer Switch (ATS) Berbasis PLC dan Interface WinCC,” Jurnal.Polban.Ac.Id, pp. 4–5, 2021, [Online]. Available: https://jurnal.polban.ac.id/ojs-3.1.2/proceeding/article/view/2672/2065
[14] B. Sakti, Y. Yulianto, and S. Adhisuwignjo, “Rancang Bangun Sistem SCADA (Supervisory Control And Data Acquisition) dan Display Pada Pembangkit Listrik Tenaga Mikrohidro Berbasis IoT (Internet of Things),” J. Elektron. dan Otomasi Ind., vol. 8, no. 2, p. 156, 2021, doi: 10.33795/elk.v8i2.286.
[15] B. Yoma and E. Anisa, “Analisis Implementasi Komunikasi Modbus TCP / IP dalam Penerapan Visualisasi Data Hasil Produksi pada Sistem Andon Line Production Analysis of the Implementation of Modbus TCP / IP Communication in the Application of Production Data Visualization in the Andon Line Production System,” vol. 5, pp. 43–52, 2023.