Perancangan Drilling Jig Fixture untuk Flange Drum Spinner di PT. Melu Bangun Wiweka
Main Article Content
Abstract
The tire manufacturing process involves a critical building stage using a drum spinner machine, which requires a flange to connect the drum and frame at PT. Melu Bangun Wiweka experienced frequent misalignment issues due to the manual drilling of flange holes. To solve this, a drilling jig fixture was developed to ensure accurate hole placement. Made from SS400, a material known for its good machinability under manual conditions, the fixture measures 303 × 400 × 500 mm. Its implementation significantly reduced drilling time from 21.67 minutes to 8.17 minutes. The estimated manufacturing cost of the fixture is IDR 12,097,097. By using this fixture, the company can save approximately IDR 6,436,000 per month when producing 1,000 units. A cost analysis reveals that the (BEP) is reached at 1,879 units, with each unit priced at IDR 17,807. This innovation improves efficiency, ensures precision, and offers significant cost savings in the long term.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Artikel yang diajukan untuk dipublikasikan pada JTRM (Jurnal Teknologi dan Rekayasa Manufaktur) ini adalah karya dari penulis dan/atau tim penulis yang memiliki pembahasan pada bidang sains dan teknologi. Naskah tersebut belum pernah dipublikasikan di Jurnal (media) apapun atau tidak sedang diajukan untuk dipublikasikan pada jurnal atau prosiding lain. Apabila terdapat duplikasi penerbitan, artikel akan dicabut/dihapus oleh Dewan Redaksi.
Nama dan alamat email yang dimasukkan pada laman JTRM (Jurnal Teknologi dan Rekayasa Manufaktur) hanya akan digunakan sebatas kepentingan penerbitan artikel pada laman JTRM (https://jtrm.polman-bandung.ac.id/) dan tidak akan diberikan kepada pihak lain untuk kepentingan apapun.
References
[2] “Perkembangan Jumlah Kendaraan Bermotor Menurut Jenis - Tabel Statistik - Badan Pusat Statistik Indonesia.” Accessed: Feb. 22, 2025. [Online]. Available: https://www.bps.go.id/id/statistics-table/2/NTcjMg==/perkembangan-jumlah-kendaraan bermotor-menurut-jenis--unit-.html
[3] H. Ponda, N. F. Fatma, and I. Siswantoro, “Usulan Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (Vsm) Dalam Meminimalkan Waste Pada Proses Produksi Ban Motor Pada Industri Pembuat Ban,” Heuristic, pp. 23–42, Apr. 2022, doi: 10.30996/heuristic.v19i1.6568.
[4] “Tabel VC | PDF,” Scribd. Accessed: Jun. 10, 2025. [Online]. Available: https://de.scribd.com/document/414030908/Tabel-VC
[5] “332-general-catalog.pdf.” Accessed: Jun. 12, 2025. https://www.nachiamerica.com/download/332-general-catalog/ [Online]. Available:
[6] Kurniwan. Bahan Ajar “Sistem Gaya Pada Proses Pemesinan & Waktu Proses. Politeknik Manufaktur Bandung.